NOTRH LEADING
   LAND SURVEYOR

Why Us?

Success Through Customer Satisfaction

Our goal is to provide accurate, precise and reliable service to clients on time and within specified budget. Our experience, combined with state-of-the-art equipment and systematic survey and procedural techniques, are
matched only by our passion for efficiency and excellence to deliver the best.

 

Our main strength is our multidisciplinary and highly experienced team which gives us
a 360º understanding of any project we undertake.

 

 

Deliverables Instrumentation

Our office equipped with the following equipment:

 

  •  3 units Nikon Total-Station
  •  3 unit Topcon Levelling Instrument
  •  3 units HP AQ Size Colour Printer
  •  5 units High Specification PC
  •  2 units CDS Software
  •  2 units CPS Software
  •  2 unit I-Tool F2F Software
  •  5 Licences ACAD 2014
  •  2 unit P500 ASHTECH Magellan GPS Receiver
  •  1 unit Phantom 3 Pro Drone

 

If required, from our associates, we're able to deploy instruments such as:

 

  •  Digital Side Scan Sonar
  •  Multi Beam Echo Sounder
  •  Current Meter
  •  Underground Detector

 


 

List of Reference

Selected few of sizeable Survey Jobs that have been completed. 

 

  •  Landed Title Survey for Big Scheme
  •  Strata Title
  •  Variety of Engineering Survey
  •  Hydrography Survey

 

 

 

 1  2007 Kedah State Forestry Department Status: Completed 
   

Value: RM 3.0M

Title Survey for Cebar and Sungkup Forest Reserve, Kedah.

 

 
 2  2004 Darulaman Realty Sdn. Bhd. Status: Completed 
   

Value: RM 500K

Mix Development at Sungai Petani Perdana for 300 arce, Sungai Petani, Kedah.

 

 
 3  2000-05 Jabatan Pengairan dan Saliran Kedah Status: Completed 
   

Value: RM 100K

Irrigation and Flood Mitigation Project in Kota Setar, Kedah.

 

 
 4  2002 Jab. Pembangunan UiTM Shah Alam Status: Completed 
   

Value: RM 50K

Survey for New Campus in Merbok, Sungai Petani, Kedah.

 

 
 5  2000 Jabatan Kerja Raya Pulau Pinang Status: Completed 
   

Value: RM 20K

Survey for New Mosque at Bertam

 

 
 6  2004 Jabatan Kerja Raya Negeri Perlis Status: Completed 
   

Value: RM 50K

Proposed New Road at Padang Melangit.

 

 
 7  2000-2005 Jabatan Kerja Raya Negeri Kedah Status: Completed 
   

Value: RM 50K

Road Survey for Black Sport  Stretch along Jalan Simpang 4, Kota Setar, Kedah.

 

 
 8  2000 Kedah State UPEN Status: Completed 
   

Value: RM 100K

Engineering and Title Survey for Beris Dam Resettlement Area at Sik, Kedah.

 

 
 9  2000 MIEL Kuala Lumpur Status: Completed 
   

Value: RM 200K

New Industrial Area and Shop Lots for 200 arce at Kuala Kangsar, Perak.

 

 
 10  2000 Perbadanan Kemajuan Negeri Kedah Status: Completed 
   

Value: RM 350K

New Industrial Area at Gurun for 500 arce - Engineering and Title Survey.

 

 
 11  1998 Tenaga Nasional Berhad - Kuala Lumpur Status: Completed 
   

Value: RM 3.00M

Way leave exercise 500Kv from Gurun to Air Tawar.

 

 
 12  2000 Darulaman Realty Sdn. Bhd. Status: Completed 
   

Value: RM 650K

New Township at Pelubang 1, Jitra, Kubang Pasu, Kedah - Title and Engineering Survey.

 

 
 13  2000 Country Height Sdn. Bhd. Status: Completed 
   

Value: RM 650K

New College Height Utara at Ladang Jenan, Jitra, Kubang Pasu, Kedah.

Phase A - Title Survey for 400hac

 

 
 14  1998 Tenaga Nasional Berhad - Kuala Lumpur Status: Completed 
   

Value: RM 250K

500Kv Transmission Line (Junjung - Air Tawar Perak)